Alcatraz Avenue and Santa Rosa Avenue Pipeline Replacement Project
Bid Opening: July 1, 2026 – 10:00 am
Bid Opening Results
Join Zoom Meeting
https://us02web.zoom.us/j/84568452288?pwd=ogai1B8sNGL1wxgQvu3ILXOS9LJans.1
Meeting chat link
https://us02web.zoom.us/launch/jc/84568452288
Meeting ID: 845 6845 2288
Passcode: 545133
One tap mobile
+16694449171,,84568452288#,,,,*545133# US
+16699009128,,84568452288#,,,,*545133# US (San Jose)
Join instructions
https://us02web.zoom.us/meetings/84568452288/invitations?signature=5FiaDuS4P6MXHLHoh16wuKEgF0bQwlgZgVT_-JoduYA
This Public Works Contract consists of construction of Owner’s Alcatraz Avenue and Santa Rosa Avenue Pipeline Replacement Project located in Half Moon Bay. Work includes, without limitation:
- Installation of approximately 660 linear feet(LF) of 6-inch Ductile Iron Pipe (DIP) by open trench, as shown on the Contract Drawings.
- Installation of water service lines, meters, and reconnection of water services.
- Installation of two blow-off assemblies.
- Installation of valves and other appurtenances.
- Abandonment of existing water facilities.
- Connection of the new water mains to the existing 10-inch.
- Surface restoration.
No pre-bid meeting is scheduled. If a Contractor wishes to visit the project site with District personnel, the Contractor can coordinate a site visit with Darin Sturdivan, Distribution Supervisor, by calling him at (650) 276-0271. The Engineer’s estimate of the construction cost is $386,000.
Bid documents consisting of the Contract Forms, Conditions of the Contract, General Requirements, Technical Specifications, and the Contract Drawings are available online by copying and pasting the following link into your web browser or for pickup at Barker Blue, 363 N. Amphlett Blvd., San Mateo, CA 94401, (650) 696-2100.